Hard Rock Las Vegas Moves Forward with Three Entertainment Venues in Former Mirage Redevelopment

Elena Powell · Aug 17, 2026

Hard Rock Las Vegas Moves Forward with Three Entertainment Venues in Former Mirage Redevelopment

Hard Rock Las Vegas redevelopment site showing construction plans for new entertainment venues on the Las Vegas Strip

Hard Rock International has outlined plans for three separate entertainment spaces as it converts the former Mirage property into Hard Rock Las Vegas, a project centered on the Guitar Hotel tower and set to open in late 2027, according to Clark County filings and project documents.

The venues break down into a newly built 2,000-seat West Theater arena on the west side of the site, the 5,000-seat Hard Rock Live that will take over the space once occupied by the Beatles Love theater, and a repurposed version of the original Mirage Theater designed for smaller comedy and specialty productions. These elements form the core entertainment lineup for the redeveloped resort, with the Paradise Town Advisory Board scheduled to review the plans before the Clark County Commission grants final approval.

Details on the Planned Venues

The West Theater arena represents new construction positioned on the west side of the property, offering a 2,000-seat capacity for a range of performances and events once the resort opens. This addition stands apart from the other two spaces because it requires fresh building work rather than adaptation of existing structures, and project records tie its design directly to the overall Guitar Hotel tower development.

Hard Rock Live, by contrast, will occupy the footprint of the former Beatles Love theater and scale up to 5,000 seats, positioning it for major touring acts and extended residencies. Observers note that this replacement approach allows the project to leverage an established theater location while expanding audience size to match the scale of Hard Rock International's entertainment strategy across its properties.

The third venue reuses the former Mirage Theater for more intimate programming, including comedy shows and specialty productions that suit a smaller room. This repurposing keeps the original theater shell intact while shifting its focus away from large-scale productions toward closer audience experiences, a move documented in the same Clark County project applications that cover the rest of the redevelopment.

Project Timeline and Approval Process

Filings submitted to Clark County detail the entertainment components alongside the broader transformation of the Mirage site into Hard Rock Las Vegas, with the full resort including the signature Guitar Hotel tower targeted for a late 2027 debut. The sequence calls for the Paradise Town Advisory Board to examine the proposals in the coming months, after which the Clark County Commission will conduct its final review and issue any necessary approvals.

Project documents indicate that construction on the West Theater arena and modifications to the existing theaters will proceed once permits clear the remaining local government steps. Those who've tracked similar Strip redevelopments know that advisory board input often shapes final design adjustments before commission action, and the Hard Rock Las Vegas case follows this established path without deviation at this stage.

Architectural rendering of Hard Rock Live theater and West Theater arena within the Hard Rock Las Vegas resort plans

Integration with Overall Resort Plans

The three venues connect to the larger redevelopment that replaces Mirage branding and attractions with Hard Rock International's signature elements, including the Guitar Hotel tower as the visual and functional anchor. Records show that the entertainment spaces were specified as distinct from casino, hotel, and dining components, ensuring each theater serves a defined role in the resort's programming calendar once operations begin in 2027.

Clark County documentation lists the West Theater as entirely new construction, while the Hard Rock Live and repurposed Mirage Theater rely on adaptive reuse of existing infrastructure. This combination reduces the need for complete demolition in two of the three locations and aligns with standard practices for Strip property conversions where speed to opening remains a priority.

Regulatory Context in Clark County

The upcoming Paradise Town Advisory Board session represents the next formal checkpoint for the entertainment plans, and any recommendations from that body will feed directly into the Clark County Commission's decision. Project applications already include capacity figures, location details, and intended uses for each venue, giving reviewers the data needed to evaluate traffic, noise, and operational impacts.

Those familiar with the process note that filings of this type typically address parking allocations, loading zones, and emergency access for large performance spaces, and the Hard Rock Las Vegas submissions cover those elements for the 2,000-seat and 5,000-seat theaters. Final commission approval will clear the way for building permits and the start of visible construction activity on the west side arena and theater conversions.

Conclusion

Hard Rock International's filing with Clark County establishes a clear framework for three entertainment venues at the future Hard Rock Las Vegas, each sized and positioned to serve different performance formats while supporting the resort's scheduled late 2027 opening. The West Theater arena, Hard Rock Live replacement, and repurposed Mirage Theater together create a tiered lineup that matches documented project plans now advancing through the Paradise Town Advisory Board and Clark County Commission reviews.